Locomotive preparation         
All locomotives pass though the shops before being dispatched on a return trip to Sishen. Before the window cleaner starts work on Class 9E E9006, he attaches a monkey chain (a nylon strap in this case) to one of the grabs above the windscreens - it's about four metres down to the shop floor!
See also the Wikipedia article on the South African Class 9E, Series 1.
Date: 2/10/2013 Location: Saldanha, WC  Country Flag Views: 667 Collection Of:   Col André Kritzinger
Author:  Col André Kritzinger
Locomotive preparation
Picture Categories: Yard This picture is part of album:  Sishen-Saldanha Iron Ore Export Line (OREX)
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=3373491