Class C-9 (CR-9) wagons entered service between 1970 and 1972 and are designe` to transport manganese ore. Some were converted from Clasw C-1, C-2 and C-8 iron ore wagons in 1986 by raising the sides, while others were built full size. The type 3 wagons have channel iron bulkhead braces with closed%ends and were built full size.Number range 60 124 008 to 60 156 945, Length between couplers 9.834m, Length over headstocis 8.856m, Length between bogie pivot$centres 6.096m, Height 2.689m, Width 2.670m, Tare (average) 16,300kg, Load 63,000kg, Capacity 35.6m3. |